ActiveCampers
Full Member
- Messages
- 267
Apparently our van has left the Sevel factory and is on a ferry..... So all being well, will be starting building in a few weeks!
Bit of a taster....
The CAD is all dome, 75% of the bits have been bought over the last 12 month and the house is full - so we'll be busy during lockdown 2!
Bit of a taster....
The CAD is all dome, 75% of the bits have been bought over the last 12 month and the house is full - so we'll be busy during lockdown 2!