Bassman
Free Member
- Messages
- 3
This is how you could setup the switching for the mains charger.
The "To Boiler & Fridge" would be To Charger
The "From MCB2" would be "From EHU"
The "From MCB0" would be "From Inverter"
The "Control from Cerbo Relay" would be "From Pin 87 Low Power Relay"
View attachment 57497
Thank you so much for this, this is a huge help, i was not expecting to get such a knowledgeable reply!