Admin
Administrator
- Messages
- 2,378
The initial cost of installing electric hook-ups across the site could be tens of thousands. The site may need to upgrade the grid electric supply, which could be tens of thousands. Then, you have ongoing maintenance and inspection costs. If the site ended up spending £50,000 on a 50-pitch site, it would take a lot of nights to see a return on that investment. It would not be just to load that cost onto people who don't use electricity.