Who's Awake

This is our temporary kitchen we had an old coffee table in the garage that we put in the bay window, we have an air fryer and a sandwich toaster too.

View attachment 76881
The Joiner will be back at 08:00 today to install the cooker hood, fit the unit doors, plumb in the dishwasher and connect the fridge, both of which are in the lounge at the moment, fit the final splashbacks and lay the kitchen floor. Then he has to fit a new door from the Dining Room, take a 2 week holiday, and return to lay a new floor in the lounge and dining room, provided that the plasterer has arrived to skim ceiling and walls and the hole that used to be the fireplace ...

Steve
 
IMG_1561.jpegIMG_1560.jpegIMG_1563.jpegThe Joiner will be back at 08:00 today to install the cooker hood, fit the unit doors, plumb in the dishwasher and connect the fridge, both of which are in the lounge at the moment, fit the final splashbacks and lay the kitchen floor. Then he has to fit a new door from the Dining Room, take a 2 week holiday, and return to lay a new floor in the lounge and dining room, provided that the plasterer has arrived to skim ceiling and walls and the hole that used to be the fireplace ...

Steve
You sound like your at the same stage we are although our plasterwork is done units and worktop in just need cutting out for hob and sink and then the internal fridge, freezer, washer, dryer and dishwasher to fit and the final flooring and tiling fingers crossed one more week.
 
Last edited:
Morning
 
Back
Top