Who's Awake

Morning

Rain forecast which isn't really supposed to happen in foreign-country-holiday-land!!
They've taken back control, so they can jolly well forecast what they like, Graham. And, just like back home, the forecast doesn't mean that it will happen ... :D

Steve
 
Morning

More rain forecast for today.
 
Ditto!

Morning
I thought Ditto was a disinfectant, Graham. You haven't caught something nasty, have you? Rampant oxidisation from all that rain in Spain ... :ROFLMAO:

We will have contractors back on site in about 1 hour or so, after we had to ask for a break of 1 day to get the start of a new outbreak of dry rot treated [7 weeks+ of sodden overlapping joists left to try to dry out in an enclosed ceiling void whilst Aviva faffed about getting contractors on site ...]. The entire ceiling void was resprayed with Dry Rot Chemical Protection yesterday, to kill any new growth and protect the joists that were inaccessible when the original treatment was applied].

By tonight, we should have a new Dining Room Ceiling, protected from the wind whistling through the gaping hole in the Upstairs Flat ceiling and floorboard gaps ...

Steve
 
I thought Ditto was a disinfectant, Graham. You haven't caught something nasty, have you? Rampant oxidisation from all that rain in Spain ... :ROFLMAO:

We will have contractors back on site in about 1 hour or so, after we had to ask for a break of 1 day to get the start of a new outbreak of dry rot treated [7 weeks+ of sodden overlapping joists left to try to dry out in an enclosed ceiling void whilst Aviva faffed about getting contractors on site ...]. The entire ceiling void was resprayed with Dry Rot Chemical Protection yesterday, to kill any new growth and protect the joists that were inaccessible when the original treatment was applied].

By tonight, we should have a new Dining Room Ceiling, protected from the wind whistling through the gaping hole in the Upstairs Flat ceiling and floorboard gaps ...

Steve
Hope you put insulation up before the ceiling, you dont want to be heating the flat above for free.
 
Hope you put insulation up before the ceiling, you dont want to be heating the flat above for free.
Insulation going in as I type, Trev, About 40% of the ceiling had insulation sitting on slats that had been nailed to the joist sides 1/2 way down, so not affected by the leak, and were above the damaged ceiling, so remained in situ. New insulation will sit above the totally replaced ceiling plasterboard. so again, should be free from a soaking if there is another leak.

Plasterer arriving tomorrow to skim the new ceiling. The old ceiling was all shapes and sizes, but joist straps have been fixed this morning to a laser level line to overcome some of the 1840 rudimentary joist trimming by axe ...

Steve
 
I didn't tell you Steve but the workmen finished ours after 2 weeks like they said they would. A neighbour took some photos and sent them to us and it looks good.
 